The Burlington Canal Lift Bridge is undergoing maintenance and upgrades and will be closed through March 20, 2023.

The Great Lakes Waterfront Trail will be closed on the Lift Bridge during the repair period.  This will affect connectivity of the route between Hamilton and Burlington for both the linear Trail and the HamBur Loop.

Those wishing to travel the Trail during the closure may still making the scenic connection through Hamilton and Burlington following HamBur Loop signage along the Red Hill Valley Trail, the Hamilton Escarpment Trail, along Ferguson Street and through Bayfront Park in Hamilton, and along North Shore Blvd. in Burlington including the newly-reopened bridge on Valley Inn Road.